top of page
S&Z_logo.png
SZ New Short.png

Greensborough TBM

North East Link Big Build TBM Works

Laser boring works under the Greensborough rail line for the installation of a 930mm OD casing and pipe for water and 540mm casing and pip for gas. Our dry vac system was also used to help minimise spoil and eliminate the need to use water and allowed for dry spoil to be reused for reinstatement. This resulted in considerable project savings.

Go Back
bottom of page